Mathematics · Standard Costing and Variance Analysis
An engineering firm has a standard variable overhead rate of 40 per machine hour. Standard machine hours allowed per unit is 5. For a month, budgeted output was 1,200 units, and actual output achieved was 1,100 units. Total actual variable overheads were 235,000 for 5,800 actual machine hours worked. Calculate the Variable Overhead Expenditure Variance and Variable Overhead Efficiency Variance.
- 1Expenditure: -235,000; Efficiency: -220,000
- 2Expenditure: -3,000; Efficiency: +12,000
- 3Expenditure: +3,000; Efficiency: -12,000
- 4Expenditure: -3,000; Efficiency: -12,000✓
Correct answer
Expenditure: -3,000; Efficiency: -12,000
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Mathematics?
Practice full-length Mathematics mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Standard Costing and Variance Analysis?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Mathematics · Standard Costing and Variance Analysis