राजमार्गों के लिए, यदि खुली कटाई (open cut) की गहराई किससे अधिक हो जाती है, तो खुली कटाई के बजाय सुरंग बनाने को प्राथमिकता दी जाती है?
- 125 मीटर
- 220 मीटर✓
- 315 मीटर
- 410 मीटर
सही उत्तर देखें
20 मीटर