महत्वपूर्ण पथ विश्लेषण (Critical Path Analysis) में, CPM क्या है?
- 1गतिशील प्रकृति (Dynamic in nature)
- 2निश्चयात्मक प्रकृति (Deterministic in nature)✓
- 3प्रायिकतात्मक प्रकृति (Probabilistic in nature)
- 4घटना उन्मुख (Event oriented)
सही उत्तर देखें
निश्चयात्मक प्रकृति (Deterministic in nature)