भारतीय मानक ब्यूरो (BIS) के विनिर्देशों के अनुसार साधारण पोर्टलैंड सीमेंट का प्रारंभिक जमाव समय (initial setting time) किससे कम नहीं होना चाहिए?
- 1600 मिनट
- 260 मिनट
- 330 मिनट✓
- 410 मिनट
सही उत्तर देखें