निम्नलिखित में से कौन सा उत्पाद-प्रक्रिया संयोजन गलत सुमेलित है?
- 1बड़े घंटे (Bells) – लोम मोल्डिंग✓
- 2बड़े पाइप – अपकेंद्रीय कास्टिंग (Centrifugal casting)
- 3आभूषण – इन्वेस्टमेंट कास्टिंग
- 4एल्युमिनियम पिस्टन – प्रेशर डाई कास्टिंग
सही उत्तर देखें
बड़े घंटे (Bells) – लोम मोल्डिंग