Current Affairs · Infrastructure Development
With reference to the Delhi–Meerut Namo Bharat Regional Rapid Transit System (RRTS), consider the following statements: 1. The total length of the corridor is approximately 82 km. 2. The corridor consists of 24 stations, including both RRTS and Meerut Metro stations. 3. The maximum operational speed of the Namo Bharat trains on this corridor is 140 km/h. Which of the statements given above are correct?
- 11, 2 and 3
- 22 and 3 only
- 31 and 3 only
- 41 and 2 only✓
Correct answer
1 and 2 only
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Current Affairs?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Infrastructure Development?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Current Affairs · Infrastructure Development