Economics · Economy
With reference to different project delivery models used for infrastructure development in India, consider the following pairs: I. Hybrid Annuity Model (HAM): A part of the project cost is borne by the government, while the remaining cost is arranged by the private developer; the developer is repaid through annuities over time. II. Engineering, Procurement and Construction (EPC): The private entity undertakes financing, construction and operation of the project and recovers its investment from the users. III. Build-Operate-Transfer (BOT): The private developer is permitted to build and operate the facility for a specified concession period before transferring it to the government. How many of the above pairs are correctly matched?
- 1None
- 2All the three
- 3Only two✓
- 4Only one
Correct answer
Only two
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Economics?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Economy?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Economics · Economy