Environment & Ecology · Environmental Engineering
Why is risk assessment an important component of reclaimed-water reuse planning?
- 1It determines whether wastewater can bypass treatment units
- 2It helps identify exposure pathways, hazards, and the level of control needed to protect users and the environment✓
- 3It replaces the need for monitoring and regulation
- 4It is used only to estimate pumping costs
Correct answer
It helps identify exposure pathways, hazards, and the level of control needed to protect users and the environment
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Environment & Ecology?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Environmental Engineering?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Environment & Ecology · Environmental Engineering