Physics · Physics
Why is a small gap left at the joint between two railway tracks?
- 1To make construction easier.
- 2To make maintenance easier.
- 3Because metal expands on heating and contracts on cooling.✓
- 4To reduce the vibration of trains.
Correct answer
Because metal expands on heating and contracts on cooling.
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Physics?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Physics?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Physics · Physics