Which type of estimate is prepared for the given work? 'Work: If the whole road surface is full of corrugation and patches, then the total surface is to be scarified. The old metal is taken out, reconsolidation by adding more metal is done and the top surface is repainted.'
- 1Revised estimate
- 2Annual repair estimate
- 3Special repair estimate✓
- 4Supplementary estimate
Correct answer
Special repair estimate