Economics · Cost-Benefit Analysis
Which of the following statements are correct about Benefit-Cost Ratio (BCR) analysis? 1. If a project has a BCR greater than 1.0, it is expected to deliver a positive net present value (NPV). 2. If a project's BCR is less than 1.0, the project's costs outweigh the benefits, and it should generally be rejected. 3. The BCR is an indicator showing the relationship between the relative costs and benefits of a proposed project, expressed in monetary or qualitative terms. 4. BCR is a ratio used in a cost-benefit analysis to summarize the overall relationship between the relative costs and benefits of a proposed project.
- 1Only 1, 2 and 3
- 21, 2, 3 and 4✓
- 3Only 1, 2 and 4
- 4Only 1 and 4
Correct answer
1, 2, 3 and 4
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Economics?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Cost-Benefit Analysis?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Economics · Cost-Benefit Analysis