Which of the following precautions must be taken while handling cables during installation? (i) Prevent the cable from dragging on the floor. (ii) Prevent kinking of the cable. (iii) After laying the cable in the ducts, it should be immediately covered or suspended. (iv) Lockout/Tagout (LOTO) procedures should not be followed.
- 1(i) and (iv) only
- 2(ii), (iii) and (iv) only
- 3(i), (ii) and (iv) only
- 4(i), (ii) and (iii) only✓
Correct answer
(i), (ii) and (iii) only
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Electrical Engineering?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Industrial Safety?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Electrical Engineering · Industrial Safety