Computer · Environmental Engineering
Which of the following options is NOT a standard step or correct practice in the process of sewer construction or sewer laying?
- 1Lowering of sewer pipes either manually or with the help of machines for larger pipe diameters.
- 2Sewer laying in concrete on soft or unstable ground.
- 3For firm grounds, sewer pipe to be cast in concrete.✓
- 4After bedding, the concrete is placed in the required alignment and levels.
Correct answer
For firm grounds, sewer pipe to be cast in concrete.
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Environmental Engineering?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Computer · Environmental Engineering