Which of the following is the implementing agency for the Green Energy Corridor (GEC) Phase-II - Inter-State Transmission System (ISTS) for the 13 GW renewable energy project in Ladakh?
- 1North Eastern Electric Power Corporation (NEEPCO)
- 2National Hydroelectric Power Corporation (NHPC) Limited
- 3National Thermal Power Corporation (NTPC) Limited
- 4Power Grid Corporation of India Limited (POWERGRID)✓
Correct answer
Power Grid Corporation of India Limited (POWERGRID)
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Current Affairs?
Practice full-length Current Affairs mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Government Schemes and Infrastructure?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Current Affairs · Government Schemes and Infrastructure