Which of the following is the correct sequence of machining operations to be performed to finish a through hole of large diameter?
- 1Boring, reaming, drilling
- 2Boring, drilling, reaming
- 3Drilling, boring, reaming✓
- 4Drilling, reaming, boring
Correct answer
Drilling, boring, reaming