Which of the following is NOT a correct outcome when high-voltage leads are eliminated by mounting potential transformer (PT) bushings directly onto the equipment?
- 1Reduces the overall installation cost of the transformer
- 2Measures line-to-ground voltages effectively in a three-phase system
- 3Increases the risk of external short circuits✓
- 4Decreases the size and weight of the PT installation
Correct answer
Increases the risk of external short circuits
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Electrical Engineering?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Instrument Transformers?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Electrical Engineering · Instrument Transformers