Which of the following construction cost estimates is also commonly referred to as a Rough Order of Magnitude (ROM) estimate?
- 1Detailed cost estimate
- 2Definitive bid cost estimate
- 3Parametric cost estimate
- 4Preliminary cost estimate✓
Correct answer
Preliminary cost estimate