Which method of laying underground cables is preferred in congested areas where repairs or replacements need to be made without reopening the ground?
- 1Laying along buildings
- 2Laying on racks inside a cable tunnel
- 3Laying direct in the ground
- 4Laying in ducts✓
Correct answer
Laying in ducts
Download Single Question PDF