Which among the following statements are correct for the components of the Critical Path Method (CPM)? A. Events are represented by arrows. B. The Earliest Start Time is the soonest time that an activity can begin. C. The Latest Start Time is calculated by working backward from the end of the diagram and subtracting the activity duration. D. Slack Event Time is the actual engagement time in an event. E. The Slack Activity Time at node one should be zero. Choose the correct answer from the options given below:
- 1B, C and E only✓
- 2A, D and E only
- 3C, D and A only
- 4A, B and C only
Correct answer
B, C and E only
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for General Studies?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Project Management?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in General Studies · Project Management