What was the total electricity generation installed capacity in India at the beginning of the First Five-Year Plan during 1950-51?
- 18.5 thousand MW
- 26.3 thousand MW
- 34.3 thousand MW
- 42.3 thousand MW✓
Correct answer
2.3 thousand MW