Current Affairs · Space Infrastructure
What was the estimated total cost approved for setting up the third launch pad (TLP) at the Satish Dhawan Space Centre, Sriharikota?
- 1Rs. 5,000 crore
- 2Rs. 2,500 crore
- 3Rs. 4,000 crore✓
- 4Rs. 400 crore
Correct answer
Rs. 4,000 crore
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Current Affairs?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Space Infrastructure?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Current Affairs · Space Infrastructure