Mathematics · Estimating and Costing
What is the typical percentage provision of the total estimated cost allocated for a work-charged establishment?
- 1112% to 2%✓
- 21% to 2%
- 3112% to 3%
- 412% to 212%
Correct answer
112% to 2%