Current Affairs · Hydroelectric Energy Infrastructure
What is the total installed capacity of the Kamala Hydro Electric Project (HEP) approved for construction in Arunachal Pradesh?
- 13097 MW
- 22880 MW
- 32000 MW
- 41720 MW✓
Correct answer
1720 MW
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Current Affairs?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Hydroelectric Energy Infrastructure?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Current Affairs · Hydroelectric Energy Infrastructure