What is the primary objective of compacting soil in the field during construction?
- 1To increase its permeability
- 2To decrease its optimum moisture content
- 3To reduce its dry density
- 4To increase its shear strength and bearing capacity✓
Correct answer
To increase its shear strength and bearing capacity