Physics · Hydroelectric Power Plants
What is the primary function of a surge tank in a hydroelectric power plant?
- 1Controlling pressure changes (water hammer) in the system✓
- 2Counteracting the sound of water
- 3Changing the water flow rate
- 4Controlling the water flow rate
Correct answer
Controlling pressure changes (water hammer) in the system