What is the correct sequence of steps involved in the operational cycle leading to and execution of a Master Production Schedule (MPS) and Material Requirements Planning (MRP)? (A) Obtaining the net requirement of materials (B) Revising the preliminary master production schedule to accommodate any inadequacy of materials (C) Obtaining the specification on required production (D) Assessing the inventory in hand and on order (E) Determining the gross requirements of materials using MRP Choose the correct answer from the options given below:
- 1(C), (E), (D), (A), (B)✓
- 2(B), (C), (A), (D), (E)
- 3(A), (E), (C), (D), (B)
- 4(A), (D), (C), (B), (E)
Correct answer
(C), (E), (D), (A), (B)
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for General Studies?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Operations Management?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in General Studies · Operations Management