Under standard design and layout criteria, sewer lines should ideally be laid:
- 1straight from manhole to manhole and below the ground.✓
- 2on the road level.
- 3with a very stiff gradient.
- 4on a sharp curvature.
Correct answer
straight from manhole to manhole and below the ground.