Computer · Environmental Engineering
The water distribution mains are primarily designed to handle the:
- 1Maximum hourly demand on the maximum day (coincident draft)✓
- 2Average daily demand
- 3Maximum hourly demand
- 4Maximum daily demand
Correct answer
Maximum hourly demand on the maximum day (coincident draft)
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Environmental Engineering?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Computer · Environmental Engineering