Current Affairs · Infrastructure and Energy
The under-construction Mahi-Banswara Nuclear Power Plant project will feature four indigenous reactors. What is the electrical capacity rating of each Pressurised Heavy Water Reactor (PHWR) unit?
- 1220 MWe
- 2540 MWe
- 3700 MWe✓
- 41,000 MWe
Correct answer
700 MWe
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Current Affairs?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Infrastructure and Energy?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Current Affairs · Infrastructure and Energy