The load factor of a power plant is defined as the ratio of ________.
- 1maximum demand to the connected load in a specified time period
- 2average load to the connected load in a specified time period
- 3average load to the peak load in a specified time period✓
- 4maximum demand to the average load in a specified time period
Correct answer
average load to the peak load in a specified time period