The following data are available for a cross-drainage work: ItemCanalDrainageFull Supply Level (FSL) / High Flood Level (HFL)105.0 m106.0 mBed Level100.0 m102.0 mDischarge80 m3/s12 m3/s The most appropriate cross-drainage work for this situation is a/an:
- 1Canal siphon
- 2Siphon aqueduct✓
- 3Super passage
- 4Aqueduct
Correct answer
Siphon aqueduct