Chemistry · Industrial Chemistry
The concrete surface of a newly constructed structure is kept wet by covering it with straw or wet gunny bags. This is done to:
- 1give a smoother and cleaner surface over the cement structure
- 2prevent the development of any fungus on the surface
- 3protect the concrete structure from contamination by dust particles
- 4prevent rapid evaporation of water until hydration has proceeded sufficiently✓
Correct answer
prevent rapid evaporation of water until hydration has proceeded sufficiently
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Chemistry?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Industrial Chemistry?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Chemistry · Industrial Chemistry