Computer · Bridge Engineering
The clearance or freeboard of a bridge is generally kept between __________ above the high flood level (HFL) depending on the discharge.
- 14.0 to 5.0 m
- 22.5 to 3.5 m
- 31.8 to 2.4 m
- 40.3 to 1.5 m✓
Correct answer
0.3 to 1.5 m