The Char Dham road and tunnel infrastructure projects face severe engineering and ecological challenges mainly due to which physiographic feature?
- 1Extensive Deccan lava flows
- 2Highly folded, seismically active, and fragile rock systems✓
- 3Stable and flat alluvial plains
- 4Thick lateritic soil cover and hard granite base
Correct answer
Highly folded, seismically active, and fragile rock systems
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Geography?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Himalayan Geology and Infrastructure?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Geography · Himalayan Geology and Infrastructure