Mathematics · Time and Work
Sarthak and Mohan have been assigned a work to design a room for a ceremony. Sarthak can design the entire room in 12 days, while Mohan can design the room in 15 days. In how many days will the work be completed if they work together? (Round off to 2 decimal places)
- 16.00
- 27.33
- 36.67✓
- 45.67
Correct answer
6.67