Current Affairs · Renewable Energy
Regarding the first geothermal production well drilled in Northeast India (Arunachal Pradesh) in May 2025, which of the following statements is/are incorrect? 1. It was drilled in Dirang, West Kameng district, by the Centre for Earth Sciences and Himalayan Studies (CESHS). 2. The project is a collaborative initiative involving CESHS, Norwegian Geotechnical Institute, Icelandic firm Geotropy ehf, and Guwahati Boring Service. 3. This is India's overall first-ever geothermal drilling project.
- 1Only 3✓
- 2Only 2
- 3Both 2 and 3
- 4Both 1 and 2
Correct answer
Only 3
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Current Affairs?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Renewable Energy?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Current Affairs · Renewable Energy