Over the years, which primary factor has led to an increasing necessity for continuous maintenance, modernization, and improvement in railway track structures?
- 1Improper construction work carried out historically by default
- 2Inherent poor formation strength across all geological locations
- 3Use of naturally poor quality of tracks by default
- 4Increased track loading due to heavier axle loads and higher operating speeds✓
Correct answer
Increased track loading due to heavier axle loads and higher operating speeds
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer?
Practice full-length Computer mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Railway Engineering?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Computer · Railway Engineering