Mathematics · Linear Equations
On a construction project, three workers — Arjun, Bilal, and Chirag — were assigned three types of tasks: digging, cementing, and painting. Each spent the same number of hours on digging (x), cementing (y), and painting (z). The hours spent on each type of work were all distinct (x =y =z). The hourly wages for each worker for digging, cementing, and painting were given as follows: Arjun: Rs 12, Rs 8, Rs 5 (Total earned = Rs 260) Bilal: Rs 15, Rs 7, Rs 10 (Total earned = Rs 295) Chirag: Rs 10, Rs 9, Rs 6 (Total earned = Rs 225) Assertion (A): The hours spent by each worker on digging, cementing, and painting can be uniquely determined to be 10 hours, 10 hours, and 12 hours respectively. Reason (R): Framing and solving the system of three linear equations in terms of the hours worked will always yield a unique solution if the determinant of the coefficients is non-zero.
- 1Assertion (A) is true and Reason (R) is false.
- 2Both Assertion (A) and Reason (R) are true and Reason (R) is a correct explanation of Assertion (A).
- 3Both Assertion (A) and Reason (R) are true but Reason (R) is not a correct explanation of Assertion (A).
- 4Assertion (A) is false and Reason (R) is true.✓
Correct answer
Assertion (A) is false and Reason (R) is true.
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Mathematics?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Linear Equations?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Mathematics · Linear Equations