Match the Network Analysis concepts in Column A with their correct definitions in Column B: a. Optimistic Time — 1. Latest Finish Time minus Activity Duration b. Pessimistic Time — 2. Time an activity will take most frequently c. Most Likely Time — 3. Shortest possible time in which an activity can be completed d. Latest Start Time — 4. Maximum time required to complete an activity
- 1a-1, b-3, c-4, d-2
- 2a-3, b-4, c-2, d-1✓
- 3a-4, b-3, c-1, d-2
- 4a-3, b-2, c-4, d-1
Correct answer
a-3, b-4, c-2, d-1
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Economics?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Network Analysis?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Economics · Network Analysis