Computer · Estimation and Costing
Match the items under List 1 (Types of Estimate) with those under List 2 (Description of Estimate) and select the correct option: List 1 P. Abstract Estimate Q. Cubic rate estimate R. Revised Estimate S. Item rate estimate List 21. Prepared when there are material deviations from the original proposed estimate. 2. Accurate estimate based on the quantities of each item of work. 3. Preliminary estimate based on necessity, utility, revenue etc., prepared from knowledge and cost of similar works. 4. Based on the length, breadth, and height of the building.
- 1P - (4), Q - (1), R - (2), S - (3)
- 2P - (4), Q - (3), R - (1), S - (2)
- 3P - (3), Q - (4), R - (1), S - (2)✓
- 4P - (3), Q - (4), R - (2), S - (1)
Correct answer
P - (3), Q - (4), R - (1), S - (2)
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Estimation and Costing?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Computer · Estimation and Costing