Computer · Water Resources Engineering
Match the following flood control works with their primary functions: Flood Control Work: A. Check dams B. Terrace bunds C. Levees Function: 1. To protect surrounding areas of a river from floods. 2. To reduce the runoff velocity in stream channels. 3. To arrest sediments and surface runoff in agricultural lands.
- 1A - 1, B - 3, C - 2
- 2A - 2, B - 1, C - 3
- 3A - 1, B - 2, C - 3
- 4A - 2, B - 3, C - 1✓
Correct answer
A - 2, B - 3, C - 1
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Water Resources Engineering?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Computer · Water Resources Engineering