Environment & Ecology · Environmental Engineering
Match the design/operational term in List - I with the most appropriate implication in List - II and choose the correct code. List - I1. Short-circuiting in sedimentation tank2. Excessive weir loading3. Insufficient detention time4. Uniform flow distribution List - II a. Better clarification efficiency b. Reduced opportunity for particle settling c. Hydraulic maldistribution causing poor tank performance d. Potential carryover and disturbed overflow conditions Codes:
- 11-a, 2-d, 3-c, 4-b
- 21-c, 2-b, 3-d, 4-a
- 31-c, 2-d, 3-b, 4-a✓
- 41-b, 2-a, 3-c, 4-d
Correct answer
1-c, 2-d, 3-b, 4-a
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Environment & Ecology?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Environmental Engineering?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Environment & Ecology · Environmental Engineering