Computer Science · Software Engineering
Match List-I with List-II and select the correct answer using the codes given below: List-I P. Version Control System Q. Baseline R. Change Control S. Configuration Item List-II1. A specific version of a software system that has been formally reviewed and approved, serving as a reference point for future changes. 2. A process that manages and records changes to configuration items, ensuring proper authorization documentation and traceability. 3. A tool or system used to track and manage different versions of software source code and other project artifacts. 4. A distinct and identifiable piece of software or documentation that is under configuration management control.
- 1P-3, Q-1, R-2, S-4✓
- 2P-3, Q-2, R-1, S-4
- 3P-3, Q-1, R-4, S-2
- 4P-2, Q-3, R-1, S-4
Correct answer
P-3, Q-1, R-2, S-4
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer Science?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Software Engineering?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Computer Science · Software Engineering