Current Affairs · Infrastructure Development in Bihar
Match List I (Railway Infrastructure Advancements in Bihar since 2014) with List II (Precise Metrics): List I: A. Construction of new lines B. Multi-tracking completed C. Gauging and electrification work D. Road over bridges completed List II: 1. 1927 km2. 633. 624 km4. 739 km Codes:
- 1A-3, B-4, C-1, D-2✓
- 2A-3, B-1, C-4, D-2
- 3A-1, B-4, C-3, D-2
- 4A-4, B-3, C-1, D-2
Correct answer
A-3, B-4, C-1, D-2
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Current Affairs?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Infrastructure Development in Bihar?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Current Affairs · Infrastructure Development in Bihar