Computer · Project Management
Match List-1 with List-2 and select the correct answer using the codes given below: List-1 (Description) a. Estimation b. Planning c. Quality control d. Designing List-2 (Purpose details or functions)1. Setting objectives and determining a course of action for achieving the project objectives. 2. The science of calculating the different load requirements, so that the proposed structure can withstand worst-case scenarios. 3. To ascertain the probable cost of a proposed project. 4. Testing units and determining whether the materials are within the specifications for the final product.
- 1a-1, b-2, c-3, d-4
- 2a-4, b-2, c-3, d-1
- 3a-3, b-1, c-4, d-2✓
- 4a-1, b-2, c-4, d-3
Correct answer
a-3, b-1, c-4, d-2
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Project Management?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Computer · Project Management