In tunnel construction, what is the standard recommended time gap between blasting (explosion) and the commencement of mucking, within which the ventilation system must clear toxic gases and dust?
- 115 minutes
- 225 minutes
- 330 minutes✓
- 420 minutes
Correct answer
30 minutes