Physics · Power Systems
In power plants and electrical systems, the ratio Average LoadMaximum Load is defined as the:
- 1Peak Factor
- 2Diversity Factor
- 3Load Factor✓
- 4Plant Capacity Factor
Correct answer
Load Factor