In post-installed rebars fixed using epoxy injection, the minimum embedment length required to fully transfer tension forces should be based on:
- 1Half the bar diameter
- 2IS 1786 material specification
- 3Structural drawing notation only
- 4Development length as per IS 456✓
Correct answer
Development length as per IS 456