General Studies · Industrial Engineering and Operations Research
In job shop scheduling, which sequence of operations typically results in optimal resource utilization and minimization of job waiting times?
- 1First In, First Out (FIFO)
- 2Shortest Processing Time (SPT) first✓
- 3Earliest Due Date (EDD)
- 4Longest Processing Time (LPT) first
Correct answer
Shortest Processing Time (SPT) first
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for General Studies?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Industrial Engineering and Operations Research?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in General Studies · Industrial Engineering and Operations Research