Computer · Estimation and Costing
In civil engineering project estimation, what does the term 'Lead' refer to?
- 1The average horizontal distance between the source of material availability and the construction site, typically measured in km✓
- 2The administrative leadership responsibilities undertaken by a project management professional
- 3The technical procedure required for obtaining official valuation of an existing immovable property
- 4The vertical height through which excavated earth has to be lifted from a trench
Correct answer
The average horizontal distance between the source of material availability and the construction site, typically measured in km
Download Single Question PDF
Save this question and verified answer as a clean study sheet with live clickable link.
Share with Friends & Study Groups
Challenge your peer aspirants on WhatsApp or Telegram to solve this question!
Preparing for Computer?
Practice full-length mock tests with real exam timers, instant score analysis, and all-India ranking.
Want more practice questions on Estimation and Costing?
Solve complete topic-wise tests with detailed solutions on GkGet.
Related Practice Questions
Recommended practice questions in Computer · Estimation and Costing